Temporary Protective Plastic Sheeting | Surface Protection website

Plastic Sheeting

SB Compliance Guide page 11 states when removing lead: (B) Close and cover all duct opening in the work area with taped-down plastic sheeting. (C) Close windows and doors in the work area. Doors must be covered with plastic sheeting. (D) Cover the floor surface with taped-down plastic sheeting in the work area a minimum of six feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to contain the dust, whichever is greater

Regular price $109.00

Save: $-70.00 (Liquid error (sections/main-product line 253): divided by 0%)
/
Shipping calculated at checkout.

In stock Order now, Only 89 left! Sold out

Plastic Sheeting


Plastic Sheeting
6 mil 10' x 100' - $109.00
  • 6 mil 10' x 100' - $109.00
  • 6 mil 20' x 100' - $208.00
  • 4 mil 10' x 100' - Sold out
  • 2 mil 12' x 200' - Sold out

Description

Protective Plastic Sheeting for all types of applications.

SB Compliance Guide page 11 states when removing lead: (B) Close and cover all duct opening in the work area with taped-down plastic sheeting. (C) Close windows and doors in the work area. Doors must be covered with plastic sheeting. (D) Cover the floor surface with taped-down plastic sheeting in the work area a minimum of six feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to contain the dust, whichever is greater

Q & A

Usage & Guide

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Frequently Asked Questions

Everything you need to know about PRO TECT® Plastic Sheeting — versatile protective sheeting for covering floors, sealing doorways, protecting windows, and setting up temporary dust-control barriers during construction, renovation, painting, and maintenance work.

Plastic sheeting is used to cover surfaces, create temporary barriers, and help contain dust and debris during construction, renovation, painting, and maintenance work.
Yes. It can be used to cover floors and help protect them from dust, debris, and work-related mess. Secure it appropriately and use a suitable protection system for the specific surface and working conditions.
Yes. When installed and sealed correctly as part of a suitable containment system, plastic sheeting helps limit dust migration into adjacent areas.
Plastic sheeting can be one component of lead-safe renovation containment. Follow the applicable regulations, required work practices, and project specifications.
Where required by the project's containment plan or applicable regulations, duct openings and doorways may need to be closed or covered to help limit dust movement.
The required distance depends on the applicable rules and work conditions. The guidance supplied for this product references a minimum of six feet beyond the perimeter of surfaces undergoing renovation, or a greater distance if necessary to contain dust. Confirm the current requirements for your project.

Protect Your Work Area with PRO TECT®

From everyday surface protection to temporary renovation barriers, PRO TECT® Plastic Sheeting helps contractors prepare work areas and protect surrounding spaces during construction, remodeling, painting, and maintenance projects.

Call PRO TECT: 1-800-545-0826

Still have questions? Contact PRO TECT today.

Recently Viewed Products